40m*52m Permanent Structure Church House Tent For Kenya
Membrane Structure is also known as the Tensioned Membrane Structure, which is the most representative and promising architectural form of the 21st century. Breaking the pattern of pure linear architectural style, with its unique beautiful surface shape, the perfect combination of simplicity, brightness, rigidity and softness, strength and beauty, it gives a refreshing feeling and gives architects a greater Imagine and create space.
PVDF Cover:
Technical profile | ||
Technical | Technical Date | Executive Standard |
Base Fabric | High Strength Low Yarn polyester Yarn | DIN EN 60001 |
Yarn count(yarn/cn) | 1100dtex | DIN ISO 2060 |
Weave Style | 12/12/yarn/cm | DIN EN 1049-2 |
Weight of Base Fabric (G/SQM) | Dyeing Cloth | |
Total Weight (G/SQM) | 1000G/SQM | |
Total thickness(mm) | 0.8mm | |
Tensile Stregth(N/5cm) | 4400/4200N/5cm | DIN EN 1421 |
Tear Strength(N) | 600/550N | DIN 53363 |
Adhesion(N/5cm) | >120N/5cm | IVK 3.13 |
Threshold Temperature | (-30)℃---(+70)℃ | DIN EN1876-1 |
Light Transmission | 5% | 5% |
Acoustical Weakening Index | 15dBA | |
Surface Treatment | Double layer PVC ,clean by itsself | Double layer PVC ,clean by itsself |
Flame Retardancy | DIN 4102B1 GB8624 B1 | |
Quality Management | DINEN ISO9001 |
Steel structure:
Steel code | Size (mm) | Cemical composition | Yield Point | Tensile Strength | Elongation | ||||
C | Si | Mn | P | S | Mpa | Mpa | δ | ||
Q235B | 114*3 | 0.15 | 0.15 | 0.37 | 0.016 | 0.018 | 290 | 390 | 26 |
Q235B | 89*3 | 0.13 | 0.14 | 0.37 | 0.022 | 0.024 | 295 | 375 | 27 |
Q235B | 140*5 | 0.14 | 0.15 | 0.41 | 0.022 | 0.022 | 285 | 380 | 28 |
Q235B | 219*7 | 0.16 | 0.12 | 0.36 | 0.018 | 0.024 | 285 | 385 | 25 |
Q235B | 87*4 | 0.13 | 0.16 | 0.36 | 0.018 | 0.022 | 290 | 385 | 26 |
Q235B | 60*3 | 0.12 | 0.16 | 0.42 | 0.018 | 0.020 | 280 | 380 | 27 |
Inspection standard: GB/T3091-2008 |
4.Not be rusty & rotted
5.Galvanized steel beams and brackets.
6.More freedom of building physical shape
7.Better cost-effectiveness
8.A shorter construction style
9. Lower energy losses
10.Greater span of the building space
Cooperation process:
Step1.Let me know that you are interested in our products.
Step2. Discuss the specification / size about the products.
Stage and truss:what is the width,depth and height do you want?
Step3. We will send you the quotation and shipping cost if required.
Step4. If everything ok. We confirm the delivery time and delivery address. If the price not on your budget, please tell me your
budget and we choose the suitable products again and we come back to step 2.
Step5. We will send you the PI.
Step6. You pay the deposit and send us the bank slip.
Step7. We arrange production once the deposit received.
Step8. We take photos to confirm with you once goods prepared.
Step9. You pay the balance and send us the bank slip.
Step10. We deliver the goods to the shipping agent once balance received.
Step11. Update the shipping information to you before goods arrived.
Step12. Send the B/L to you and you can bring the products from the shipping agent.
Step13. We will tracking and maintenance of the goods on a regular basis.