Free design shape stadium steel strcture PVDF roof edifice permanent tent
The membrane structure canopy
Safe and Easy to instal.
Membrane structures, Tensile membrane structure, Tension membrane structures
1. Cost-effective: About 1/3 to 1/2 lower than conventional structures on costs;
2. Short Construction time: Half time is saved compared to the traditional buildings;
3. Large Span: The largest span of Tension membrane structures can exceed to 200m;
4. Features: Unique Forms with professional and high strength structure; Light in weight, concise in structure and harmonious with nature; Stable and durable; Waterproof, UV resistant, anti-rust and flame retardant; Less maintenance, energy and cost saving, easy to move and install;
5. Applications: This kind of Tension membrane structures can be widely used in seasonal or permanent structures for indoor sports and recreational facilities as gymnasiums, stadiums, swimming pools, cafeterias and food courts, exhibition and conventional centers, canopies and vehicle parkings, etc.
Steel frame specific
Steel code | Size (mm) | Cemical composition | Yield Point | Tensile Strength | Elongation | ||||
C | Si | Mn | P | S | Mpa | Mpa | δ | ||
Q235B | 114*3 | 0.15 | 0.15 | 0.37 | 0.016 | 0.018 | 290 | 390 | 26 |
Q235B | 89*3 | 0.13 | 0.14 | 0.37 | 0.022 | 0.024 | 295 | 375 | 27 |
Q235B | 140*5 | 0.14 | 0.15 | 0.41 | 0.022 | 0.022 | 285 | 380 | 28 |
Q235B | 219*7 | 0.16 | 0.12 | 0.36 | 0.018 | 0.024 | 285 | 385 | 25 |
Q235B | 87*4 | 0.13 | 0.16 | 0.36 | 0.018 | 0.022 | 290 | 385 | 26 |
Q235B | 60*3 | 0.12 | 0.16 | 0.42 | 0.018 | 0.020 | 280 | 380 | 27 |
Inspection standard: GB/T3091-2008 |
PVDF cover specific
Technical profile | ||
Technical | Technical Date | Executive Standard |
Base Fabric | High Strength Low Yarn polyester Yarn | DIN EN 60001 |
Yarn count(yarn/cn) | 1100dtex | DIN ISO 2060 |
Weave Style | 12/12/yarn/cm | DIN EN 1049-2 |
Weight of Base Fabric (G/SQM) | Dyeing Cloth | |
Total Weight (G/SQM) | 1000G/SQM | |
Total thickness(mm) | 0.8mm | |
Tensile Stregth(N/5cm) | 4400/4200N/5cm | DIN EN 1421 |
Tear Strength(N) | 600/550N | DIN 53363 |
Adhesion(N/5cm) | >120N/5cm | IVK 3.13 |
Threshold Temperature | (-30)℃---(+70)℃ | DIN EN1876-1 |
Light Transmission | 5% | 5% |
Acoustical Weakening Index | 15dBA | |
Surface Treatment | Double layer PVC ,clean by itsself | Double layer PVC ,clean by itsself |
Flame Retardancy | DIN 4102B1 GB8624 B1 | |
Quality Management | DINEN ISO9001 |
– We reply each inquiry within 24 hours
– develop and make new parts according to customers’ requirements and detailed information.
– provide service of designing, engineering, manufacturing and installation.
– our expert technicians can help you to assemble the project at site.
Why choose us
- Quality Gurantee
High strength, light weight, good material, high reliability and fast installation high level of industrialization .
- Capacity of engineer
* More that 80 professional technicians and qulified R&D Engineers.
*Based on the concept of modern design and corresponding national standards
*Most optimized design high-efficiently with the use of advanced internal aid design software, such as PKPM and 3D3S
*Complete set of production and installation drawings of steel structure to ensure the high-efficient and accurate operation
- Production capacity
*700 workers, 60000 m2 workshop, 18 years’ experience, ISO&BV&SGS certificated, one hour reach Qingdao port.
*Own light/heavy H steel production line, BOX production line ,C/Z purlin production line and various types of profiling steel sheet machines.
*The annual production capacity: main steel structure 40000mts,secondary steel25000mts, various profiling steel sheet 500000 sqm annual
- Our design, manufacture and installation experience
*18 years of accumulation and exploitation.
*Formed our own complete set of building system for wall and roof of steel structure .
*Rich experience in waterproof and insulation technology. Support quality assurance of our clients.
FAQ
- Q: Order process?
A: . Floor plan layout – Confirmation of building materials – Specific quotation – Place the order – Shop drawings – Manufacture – Shipping – Installation
- Q: How to pay?
A: T/T – 30% deposit in advance, 70% balance before shippment. OR L/C At sight.
- Q: What is the delivery time?
A: Generally speaking, the delivery time will be within 15 – 30 days.
- Q: How to deliver?
A: Delivered by 40ft GP / HQ / OT Shipping containers.
- Q: How to install?
A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send professional engineers to do the constructuion guidance
Other Hot Style